AMAZING INDUSTRIES

Something Wicked 2014

Houston, Texas

This show was big -three of the largest stages we’ve ever built- and beautiful –a lot of design work, media, scenic elements, and LED- and was built over 4 days and never fell behind schedule. A lot of 3D rendering, technical drawings, and even more hard work by a lot of proud Texans built this event. We’ll let the pictures, video, and flythroughs do the talking as we look forward to outdoing ourselves with Onstage Systems!

Here is the concept fly-through for the Skeleton Stage:

And here is the Main Stage:

And here is the Castle Stage: